Industrial Wastewater Permit Renewal – Petroleum Marine Terminal

Latitudes Environmental prepared a TPDES Permit Renewal Application package, for authorization to discharge treated wastewater from a petroleum marine terminal for the storage of refined petroleum products. The application required verifying raw materials and treatment processes; confirming points of discharge and discharge route; adding two new waste streams; and providing…

Read More

Industrial Wastewater Permit Renewal – Pipeline Transportation and Storage Terminal

Latitudes Environmental prepared a TPDES Permit Renewal Application package, for authorization to treat and discharge storm water from a pipeline terminal for refined petroleum products. The application required verifying raw materials and treatment processes; confirming points of discharge and discharge routes; adding a new waste stream; providing a current water…

Read More

Air Permit Records Review – NGL Fractionation, Storage and Transportation Company

Latitudes Environmental performed a review of the TCEQ Central Registry, to clear up any inconsistencies such as ownership, permit coverages and County reference. This effort was prompted by a recent acquisition which added a number of new facilities to the company’s portfolio. All required changes related to Customer and Regulated…

Read More

Site Development Permit – Terminal Control Building

Latitudes Environmental prepared a Minor Site Development Application for submission to the Harris County Architecture and Engineering Division. The permit called for building specifications, utilities, property boundaries and floodplain elevations. Since the site is located in the hazardous floodplain, the foundation design would ensure that the finished floor of the…

Read More

Storm Water Quality (SWQ) Permit Annual Renewal – 26-acre Detention Pond

Latitudes Environmental performed a pond inspection, certification and permit renewal on a detention pond located on a products terminal in Mont Belvieu, Texas. The annual renewal was required under the Certificate of Compliance issued by Harris County. The inspection included slope condition, vegetative cover, hardscaping condition, and headwall and outfall…

Read More

Phase I Environmental Site Assessment – Mining Equipment Manufacturer

Latitudes Environmental conducted Phase I Environmental Site Assessments for three manufacturing facilities located in Idaho and Nevada. The facilities manufacture specialized equipment for the metals mining industry, including submersible pumps, exhaust fans and mine trucks. The due diligence investigations were commissioned as part of a property sale, and performed in…

Read More